乐山tangible料斗It is a must to check all safety tools when performing maintenance,When loading the cement tank,Or be very careful when entering the tank,Have a high degree of vigilance for every place with safety hazards!Don't be alone during maintenance,Can be maintained by one person,But there must be at least one overseer,The primary responsibility of supervisors is to supervise the safety of technical personnel,Carefully inspect the jar for safety hazards,In case of an accident,Should be dealt with in time!When the cement tank is used for a certain time,Often requires maintenance,For example, do some maintenance and cleaning,Maintenance personnel must put safety first during maintenance!Some time ago, there was an accident in Fuzhou caused by the lack of attention to safety when repairing cement tanks,This accident has awakened our safety awareness in a wake-up call!Many maintenance personnel will have such a psychological,I think I'm already a very experienced technician,Very familiar with cement tank maintenance,You don't need a security tool。tangible料斗用途Experience has brought us many good aspects, but experience often lets us ignore some places, so the staff must put safety first when maintaining!
1, concrete mixing plant construction site should have flood control, drainage systems and measures, the road should be kept unblocked。2, the foundation pit, the trough should have a system of drainage ditches, and should often check the stability of the soil wall of the mixing station to avoid the collapse of the soil。3. After brushing the template with spacer, it should be covered to prevent it from being washed by rain;If it is found that the spacer is washed by rain, it should be repainted and the concrete should be poured。4, cement shed and mixer shed should be checked frequently to prevent rain leakage。5, the water content of sand and stone should be often determined, and should be deducted from the water added in the mix ratio。6, mixing station rainy day transportation of raw materials and concrete, should be covered。7. Before pouring concrete, the water in the mold should be drained。8. If the open-air structure and components of the mixing station require continuous construction without construction joints, the awning should generally be set up。Otherwise, adequate cover and waterproof materials (such as tarpaulins, linoleum, etc.) should be prepared to cover in time to prevent rain erosion。tangible料斗用途If the surface of the component is washed by rain, it should be smoothed again。9. Slope and bridleway should take anti-skid measures。10, mixing station electric machinery and wires, should be often checked by electricians whether leakage;tangible料斗用途When leakage is found, the work should be stopped immediately for repair。
First, communicate well with the urban construction department to ensure that the site will not be moved in a few years (to have an agreement) Second, what are the big construction projects in the city in recent years (including real estate road Bridges, etc.) Third, it is important that you have a sound sales network in the area,tangible料斗用途Fourth, after determining the concrete market demand or some order intention, choose a moderate model of concrete mixer and other machinery,tangible料斗用途In order to ensure production。
HZS25 concrete mixing plant is a simple and small concrete mixing plant equipment with automatic feeding function, which is composed of JS500 strong standard mixer, feed, batching, electrical control and steel structure。This simple mixing plant has the dual advantages of single independent use and PLD series batching unit into a concrete mixing plant with a production capacity of 25m3/h or more, and has simple structure, convenient disassembly and convenient construction。It has the advantages of uniform mixing concrete, short mixing time, long life of damaged parts, easy operation and maintenance, etc。料斗用途Suitable for small-scale construction sites,tangible料斗用途Prefabricated parts factory, small commercial concrete production plant and highway maintenance。It adopts new design ideas, electronic weighing, microcomputer control, digital display and other control technology, electronic weighing has buffer device and automatic compensation function, high measuring precision。Sand and gravel charging system with large width herringbone belt charging, pedestrian walkway, so that the majority of construction units to produce high-quality concrete ideal choice。
(1)乐山tangible料斗Feeding system: composed of storage hopper and feeding equipment, the main function is to store materials and feed to the weighing hopper under the control of the control system。Method of feeding system: PLD800-1200 type, feeding for belt conveyor;(2) Weighing system: The weighing system is the key part of the batching machine, which is composed of weighing hopper, suspension equipment, weighing system sensor, batching controller, etc。(3)tangible料斗用途Electrical control system: The electrical control system is the core component of the batching machine, and its function is to complete the weighing, displaying, operating and completing various active batching sequences of the entire batching machine。The system is mainly composed of two parts: batching controller and strong current circuit。
Operation rules for concrete double horizontal shaft forced mixer 1.tangible料斗用途Before use, check the power supply first press the switch, and then close the tool brake to check whether the operation is flexible。Whether the vibrator, drum and rod operate normally。The winding of the wire rope on the drum;Whether the lifting of the discharge platform is normal。If the fault is found, notify the mechanical and electrical team to deal with it。After handling, you can use it。2, a feeding should not be too much, according to the ratio of feeding, pay attention to the water cement ratio。Stir well, a stirring time should not be less than one minute, the normal mix of concrete, should be very thick porridge。3, fixed special boot, the driver should be familiar with the operating system principle, found fault immediately stop the check。4、tangible料斗用途Electrical parts should be taken care of and cables should be protected to prevent damage。5, the mixer should be flat, the mixer should not stand under the funnel, to prevent injury when the funnel falls。6. When temporarily stopping the rail, the mixer should be started regularly (every 20 minutes) to prevent the concrete from solidifying or pouring out the concrete in the roller, and wash the roller with water。7. After the concrete is poured and shut down, the mortar outside the roller and machine should be washed with water in time。The feed hopper is cleaned once per shift, so that the feed material falls to the position specified by the party when it is placed, and a layer of oil is applied on the surface for next use。8. Conscientiously implement the shift transfer system, and explain the operation of the working machine and matters needing attention clearly.